Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 10:38 AM
  • B 0366_B 0365 _25062018_034614.mp4

Date
06/25/2018
W/O
712401
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00091
PipeID
P08878
Time
3:38 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5704
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_712401_TV15051_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0366
Downstream MH
B 0365
Dir. of Survey
Downstream
Length Surveyed
130.8 ft.
Total Length
130.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole B 0366 to B 0365
MH: B 0366MH: B 0365downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03660 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start130.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish130.8 ft. AMH - Downstream Manhole, Survey Ends - B 0365130.8 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O' CLOCK AT MH130.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
130.8SAP
0MWM
130.8AMHB 0365
130.8MGOCAPPED CONNECTION AT 3 O' CLOCK AT MH
3SSS
0AMHB 0366
130.8SSS
0MGOCAPPED CONNECTION AT 9 O' CLOCK AT
3SAP

Properties (6)

additional_info
SC359662
custom_field_two
3
customer
LACSD
datetime
2018-06-25T03:38:57-07:00
documentation
PROPIPE
is_lateral_inspection
false