Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 29, 2018, 10:23 AM
  • 32 0030_32 0029 _29062018_033200.mp4

Date
06/29/2018
W/O
712244
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00886
PipeID
P19794
Time
3:23 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5754
Sewer Name
32 CASTAIC TRUNK
City
CASTAIC
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
03
Purpose
Routine Assessment
Project
WO_712244_TV32012_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
32 0029
Downstream MH
32 0030
Dir. of Survey
Upstream
Length Surveyed
100.3 ft.
Total Length
100.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412C
O&M Rating
42
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 32 0029 to 32 0030
MH: 32 0029MH: 32 0030upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 00301.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish98.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start100.3 ft. AMH - Downstream Manhole, Survey Begins - 32 0029100.3 ft. MWM - Water Mark, 50 %of cross sectional area100.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK100.3 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0AMH32 0029
100.3AMH32 0030
0MWM
98.7DAGS
2DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWL

Properties (6)

additional_info
SC359720
custom_field_two
4
customer
LACSD
datetime
2018-06-29T03:23:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false