Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2018, 07:39 AM
  • 18 0939_18 0938 _28062018_005007.mp4

Date
06/28/2018
W/O
711900
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00700
PipeID
P14787
Time
12:39 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5758
Sewer Name
18 SCOTT AVENUE TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_711900_TV18047_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 0939
Downstream MH
18 0938
Dir. of Survey
Downstream
Length Surveyed
222.2 ft.
Total Length
222.2 ft.
Structural Index
3
Structural Quick
413H
Structural Rating
136
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
136
Pipe schematic from manhole 18 0939 to 18 0938
MH: 18 0939MH: 18 0938downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 09390 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 10 %of cross sectional area3.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"120.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.9 ft. FM - Fracture Multiple, from 08 to 05 o'clock, within 8 inches of joint: YES172.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.2 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES213.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish222.2 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK222.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0938222.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 05 o'clock, within 8 inches of joint: YES

    127.9 ft. - Fracture Multiple, from 08 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    180.2 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
222.2MGOCONNECTION AT MH 12 O'CLOCK
68.7TFC
222.2AMH18 0938
20TFC
0AMH18 0939
222.2MGOCONNECTION AT MH 3 O'CLOCK
180.2FL
0MWL
127.9FM
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
218.1CM
120.3TFC
213.9TFC
3.1CM
172.1TFC

Properties (6)

additional_info
SC359667
custom_field_two
3
customer
LACSD
datetime
2018-06-28T00:39:55-07:00
documentation
PROPIPE
is_lateral_inspection
false