Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 08:32 AM
  • 02 0672_02 0671_25062018_014321.mp4

Date
06/25/2018
W/O
706681
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00311
PipeID
P03226
Time
1:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5746
Sewer Name
02 WOODRUFF AVENUE TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
WO_706681_TV02337_JUN2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
02 0671
Downstream MH
02 0672
Dir. of Survey
Upstream
Length Surveyed
37.5 ft.
Total Length
37.5 ft.
Structural Index
3
Structural Quick
3700
Structural Rating
21
O&M Index
4
O&M Quick
4800
O&M Rating
32
Overall Index
4
Overall Quick
Overall Rating
53
Pipe schematic from manhole 02 0671 to 02 0672
MH: 02 0671MH: 02 0672upstream0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DUE TO DEPOSITS/SLUDGE35.5 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS35.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start37.5 ft. AMH - Downstream Manhole, Survey Begins - 02 067137.5 ft. MWM - Water Mark, 50 %of cross sectional area37.5 ft. MWL - Water Level, 50 %of cross sectional area37.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK

Observation photos (3)

  • Deposits Settled Other,  30 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    2 ft. - Deposits Settled Other, 30 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - DUE TO DEPOSITS/SLUDGE

    37.5 ft. - Survey Abandoned - DUE TO DEPOSITS/SLUDGE

Observations (9)

DistanceCodeObservation
37.5SAP
2DSZDEBRIS
2SAP
0AMH02 0671
0MWM
37.5DSZ
0MWL
37.5MSADUE TO DEPOSITS/SLUDGE
0MGOACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK

Properties (6)

additional_info
SC359712
custom_field_two
5
customer
LACSD
datetime
2018-06-25T01:32:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false