Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 19, 2018, 04:19 PM
  • D 0085_D 0084_7192018_102308.mp4

Date
07/19/2018
W/O
0718137
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00155
PipeID
P09985
Time
9:19 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7761
Sewer Name
D JOINT OUTFALL D - UNIT 5
City
LAWNDALE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Routine Assessment
Project
20180719SHO_JOINT_OUTFALL_D_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
D 0085
Downstream MH
D 0084
Dir. of Survey
Downstream
Length Surveyed
260.1 ft.
Total Length
260.1 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole D 0085 to D 0084
MH: D 0085MH: D 0084downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 00854 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start33.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start260.1 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES260.1 ft. AMH - Downstream Manhole, Survey Ends - D 0084260.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    4 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    33.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    260.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
33.9SSS
260.1SRV
0MWL
260.1AMHD 0084
4SRV
260.1SSS
0MWM
0AMHD 0085
4SAP
260.1SAP

Properties (5)

custom_field_three
SMALL AMOUNT OF REBAR, SAP THROUGHOUT
custom_field_two
3
customer
LACSD
datetime
2018-07-19T09:19:31-07:00
is_lateral_inspection
false