Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 10:28 AM
  • 01 0331_01 0330_01022018_023246.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00801
Time
2:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5362
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0331
Downstream MH
01 0330
Dir. of Survey
Downstream
Length Surveyed
473 ft.
Total Length
473 ft.
Structural Index
3
Structural Quick
3R00
Structural Rating
282
O&M Index
2
O&M Quick
412R
O&M Rating
192
Overall Index
3
Overall Quick
Overall Rating
474
Pipe schematic from manhole 01 0331 to 01 0330
MH: 01 0331MH: 01 0330downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - MAG COATING 80%0 ft. AMH - Upstream Manhole, Survey Begins - 01 03310 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start471.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish471.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish473 ft. AMH - Downstream Manhole, Survey Ends - 01 0330

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWM
2DAGS
0MGOMAG COATING 80%
0AMH01 0331
471.4DAGS
2SAP
471.4SAP
473AMH01 0330
0MWL

Properties (6)

additional_info
SC346439
custom_field_two
2
customer
LACSD
datetime
2018-01-02T02:28:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false