Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2018, 06:56 AM
  • 01 0326_01 0325_01022018_225652.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00796
Time
10:56 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5363
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0326
Downstream MH
01 0325
Dir. of Survey
Downstream
Length Surveyed
438.6 ft.
Total Length
438.6 ft.
Structural Index
3
Structural Quick
3P00
Structural Rating
261
O&M Index
2
O&M Quick
412P
O&M Rating
178
Overall Index
3
Overall Quick
Overall Rating
439
Pipe schematic from manhole 01 0326 to 01 0325
MH: 01 0326MH: 01 0325downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 01 03260 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start438.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK438.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0325438.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish438.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish438.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
438.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK
438.6AMH01 0325
2DAGS
0MWL
438.6SAP
0MGOCOCKROACHES IN MANHOLE
438.6DAGS
438.6MGOCOCKROACHES IN MANHOLE
0AMH01 0326
0MWM
2SAP

Properties (6)

additional_info
SC346440
custom_field_two
2
customer
LACSD
datetime
2018-01-02T22:56:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false