Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 27, 2017, 10:48 AM
  • 01 0333_01 0332_12272017_024916.mp4

Date
12/27/2017
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00803
Time
2:48 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5295
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0332
Downstream MH
01 0333
Dir. of Survey
Upstream
Length Surveyed
413.1 ft.
Total Length
413.1 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
246
O&M Index
2
O&M Quick
412O
O&M Rating
168
Overall Index
3
Overall Quick
Overall Rating
414
Pipe schematic from manhole 01 0332 to 01 0333
MH: 01 0332MH: 01 0333upstream0 ft. AMH - Upstream Manhole, Survey Ends - 01 03332.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish411.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start411.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start413.1 ft. MGO - General Observation - MAG COATING 75%413.1 ft. MWL - Water Level, 30 %of cross sectional area413.1 ft. MWM - Water Mark, 50 %of cross sectional area413.1 ft. AMH - Downstream Manhole, Survey Begins - 01 0332

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
411SAP
0MGOMAG COATING 75%
411DAGS
0MWL
0MWM
2SAP
413.1AMH01 0333
2DAGS
0AMH01 0332

Properties (6)

additional_info
SC346432
custom_field_two
2
customer
LACSD
datetime
2017-12-27T02:48:54-08:00
documentation
PRO PIPE
is_lateral_inspection
false