Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 10:51 AM
  • 01 0330_01 0329_01022018_025153.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00800
Time
2:51 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5362
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0330
Downstream MH
01 0329
Dir. of Survey
Downstream
Length Surveyed
478 ft.
Total Length
478 ft.
Structural Index
3
Structural Quick
3R00
Structural Rating
285
O&M Index
2
O&M Quick
412R
O&M Rating
194
Overall Index
3
Overall Quick
Overall Rating
479
Pipe schematic from manhole 01 0330 to 01 0329
MH: 01 0330MH: 01 0329downstream0 ft. MGO - General Observation - MAG COATING 80%0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 03302 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start476.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish476.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish478 ft. AMH - Downstream Manhole, Survey Ends - 01 0329

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOMAG COATING 80%
2DAGS
478AMH01 0329
476.6SAP
0MWM
0MWL
2SAP
0AMH01 0330
476.6DAGS

Properties (6)

additional_info
SC346439
custom_field_two
2
customer
LACSD
datetime
2018-01-02T02:51:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false