Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 22, 2018, 10:53 AM
  • H 0094_H 0093_1222018_030657.mp4

Date
01/22/2018
W/O
0683963
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00165
PipeID
P10546
Time
2:53 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0729
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Capital Improvement Program Assesment
Project
20180122MDM_JOINT_OUTFALL_H_UNIT_1F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
H 0094
Downstream MH
H 0093
Dir. of Survey
Downstream
Length Surveyed
304.8 ft.
Total Length
304.8 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole H 0094 to H 0093
MH: H 0094MH: H 0093downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:05AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT135.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE135.7 ft. MGO - General Observation - 42" RCP199 ft. MGO - General Observation - MAG COAT 60% START 8:00 TO 4:00304.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE304.2 ft. MGO - General Observation - MAG COAT 60% FINISH304.8 ft. AMH - Downstream Manhole, Survey Ends - 3:50AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    135.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

  • General Observation - 42" RCP

    135.7 ft. - General Observation - 42" RCP

  • General Observation - MAG COAT 60% START 8:00 TO 4:00

    199 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE

    304.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE

Observations (10)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
135.7SSSBLISTERING PEELING CONCRETE
304.8AMH3:50AM
0MWL
199MGOMAG COAT 60% START 8:00 TO 4:00
0MWM
135.7MGO42" RCP
0AMH3:05AM
304.2SSSBLISTERING PEELING CONCRETE
304.2MGOMAG COAT 60% FINISH

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE
custom_field_two
3
customer
LACSD
datetime
2018-01-22T02:53:19-08:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false