Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2018, 04:45 PM
  • Section#6_A 0323_A 0322__5292018__I0017.mp4

Date
05/29/2018
W/O
0706684
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00325
PipeID
P08233
Time
9:45 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0017
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20180525DF_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Upstream MH
A 0323
Downstream MH
A 0322
Dir. of Survey
Downstream
Length Surveyed
619.2 ft.
Total Length
619.2 ft.
Structural Index
3
Structural Quick
5T3X
Structural Rating
1130
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
1134
Pipe schematic from manhole A 0323 to A 0322
MH: A 0323MH: A 0322downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:47 AM0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG100.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start100.1 ft. MGP - General Photograph250 ft. MGP - General Photograph297.2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES - GASKET400 ft. MGP - General Photograph450.9 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 11 o'clock, , within 8 inches of joint: YES - GASKET450.9 ft. MGP - General Photograph550.1 ft. MGP - General Photograph561.1 ft. MGP - General Photograph594.7 ft. MGP - General Photograph594.9 ft. MGP - General Photograph594.9 ft. MGP - General Photograph615.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish615.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG615.7 ft. MGP - General Photograph615.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish615.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish619.2 ft. AMH - Downstream Manhole, Survey Ends - 10:33 AM619.2 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH

Observation photos (18)

  • Water Level, 35 %of cross sectional area

    0 ft. - Water Level, 35 %of cross sectional area

  • Water Mark, 40 %of cross sectional area

    0 ft. - Water Mark, 40 %of cross sectional area

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    100.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    100.1 ft. - General Photograph

  • General Photograph

    250 ft. - General Photograph

  • Deposits Attached Other, 5 %of cross sectional area, from 02 to 04 o'clock,  , within 8 inches of joint: YES - GASKET

    297.2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES - GASKET

  • General Photograph

    400 ft. - General Photograph

  • Deposits Attached Other, 5 %of cross sectional area, from 07 to 11 o'clock,  , within 8 inches of joint: YES - GASKET

    450.9 ft. - Deposits Attached Other, 5 %of cross sectional area, from 07 to 11 o'clock, , within 8 inches of joint: YES - GASKET

  • General Photograph

    450.9 ft. - General Photograph

  • General Photograph

    550.1 ft. - General Photograph

  • General Photograph

    561.1 ft. - General Photograph

  • General Photograph

    594.7 ft. - General Photograph

  • General Photograph

    594.9 ft. - General Photograph

  • General Photograph

    594.9 ft. - General Photograph

  • General Photograph

    615.7 ft. - General Photograph

Observations (25)

DistanceCodeObservation
450.9DAZGASKET
100.1SRV
100.1MGP
2SSS
550.1MGP
400MGP
615.7SRV
561.1MGP
594.9MGP
0AMH9:47 AM
619.2AMH10:33 AM
615.7SZ70% MAG
594.9MGP
2SAV
619.2MGOGREASE THROUGHOUT THE REACH
615.7MGP
0MWL
450.9MGP
2SZ70% MAG
0MWM
594.7MGP
250MGP
297.2DAZGASKET
615.7SAV
615.7SSS

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-05-29T09:45:39-07:00
documentation
FRANKLIN, SHADLER, PARAISO
is_lateral_inspection
false