Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 05:38 AM
  • 16 0550_16 0549 _28092017_223844.mp4

Date
09/28/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13601
Time
10:38 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0550
Downstream MH
16 0549
Dir. of Survey
Downstream
Length Surveyed
267.6 ft.
Total Length
267.6 ft.
Structural Index
3
Structural Quick
413I
Structural Rating
160
O&M Index
2
O&M Quick
2I13
O&M Rating
107
Overall Index
2
Overall Quick
Overall Rating
267
Pipe schematic from manhole 16 0550 to 16 0549
MH: 16 0550MH: 16 0549downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05500 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach2.9 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3 ft. MGO - General Observation - MAG COAT START12.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"33.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"77.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"78.7 ft. RFJ - Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES85.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"92.4 ft. B - Broken, from 02 to 03 o'clock, within 8 inches of joint: YES - ROOTS117.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"122.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"158.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"161.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"176.2 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES199.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"211.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"251.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"255.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"263.1 ft. MGO - General Observation - MAG COAT FINISH263.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish263.1 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish267.6 ft. AMH - Downstream Manhole, Survey Ends - 16 0549

Observation photos (5)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES

    78.7 ft. - Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Broken, from 02 to 03 o'clock, within 8 inches of joint: YES - ROOTS

    92.4 ft. - Broken, from 02 to 03 o'clock, within 8 inches of joint: YES - ROOTS

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

    176.2 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (26)

DistanceCodeObservation
255.6TFC
0MWM
267.6AMH16 0549
176.2RFJ
0AMH16 0550
0MWL
251.4TFC
263.1MGOMAG COAT FINISH
3MGOMAG COAT START
158.9TFC
161.8TFC
85.5TFC
211.6TFC
78.7RFJ
2.9SAV
199.5TBA
2.9DAGS
0VC
263.1DAGS
92.4BROOTS
33.2TFC
77.4TBA
122.8TFC
263.1SAV
12.9TFC
117.4TFC

Properties (6)

additional_info
SC352127
custom_field_two
2
customer
LACSD
datetime
2017-09-28T22:38:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false