Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2018, 08:15 AM
  • B 0405_B 0404 _22062018_012608.mp4

Date
06/22/2018
W/O
712460
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00091
PipeID
P08917
Time
1:15 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5702
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
ARCADIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
WO_712460_TV15047_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0405
Downstream MH
B 0404
Dir. of Survey
Downstream
Length Surveyed
237.8 ft.
Total Length
237.8 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
229
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
231
Pipe schematic from manhole B 0405 to B 0404
MH: B 0405MH: B 0404downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - B 04052.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start112.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"184.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"214.3 ft. RFB - Roots Fine Barrell, from 10 to 02 o'clock215.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.8 ft. AMH - Downstream Manhole, Survey Ends - B 0404237.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish237.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Barrell, from 10 to 02 o'clock

    214.3 ft. - Roots Fine Barrell, from 10 to 02 o'clock

Observations (15)

DistanceCodeObservation
0MWL
237.8AMHB 0404
0MWM
237.8SAV
0MGOCONNECTION AT MH 3 O'CLOCK
15.6SSS
215.2TFA
214.3RFB
184.5TF
176.6TF
237.8SSS
118.4TFA
2.1SAV
0AMHB 0405
112.7TF

Properties (6)

additional_info
SC359660
custom_field_two
3
customer
LACSD
datetime
2018-06-22T01:15:50-07:00
documentation
PROPIPE
is_lateral_inspection
false