Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 12, 2018, 08:56 AM
  • 15 0661_15 0660 _12062018_022211.mp4

Date
06/12/2018
W/O
707118
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00602
PipeID
P12553
Time
1:56 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5191
Sewer Name
15 EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_707118_TV15005_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0661
Downstream MH
15 0660
Dir. of Survey
Downstream
Length Surveyed
92.5 ft.
Total Length
92.5 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 15 0661 to 15 0660
MH: 15 0661MH: 15 0660downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06610 ft. MWL - Water Level, 30 %of cross sectional area0.1 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start20.8 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES48.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.5 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES92.5 ft. MSA - Survey Abandoned - UNKNOWN DEBRIS92.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish92.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish92.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

    20.8 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
2DAGS
0MWM
0AMH15 0661
0.1MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
48.9TFC
92.5DSC
10.8SSS
0MWL
92.5MSAUNKNOWN DEBRIS
92.5SAP
92.5DAGS
20.8FS
92.5SSS
2SAP

Properties (6)

additional_info
SC359514
custom_field_two
2
customer
LACSD
datetime
2018-06-12T01:56:20-07:00
documentation
PROPIPE
is_lateral_inspection
false