Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2018, 10:00 AM
  • 15 0675_15 0674 _13062018_031058.mp4

Date
06/13/2018
W/O
707118
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00602
PipeID
P12567
Time
3:00 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5194
Sewer Name
15 EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_707118_TV15005_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0675
Downstream MH
15 0674
Dir. of Survey
Downstream
Length Surveyed
47.5 ft.
Total Length
47.5 ft.
Structural Index
3
Structural Quick
4131
Structural Rating
11
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 15 0675 to 15 0674
MH: 15 0675MH: 15 0674downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 06750 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES7.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish7.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start16.6 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES45.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish45.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish45.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish47.5 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH47.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0674

Observation photos (6)

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING start

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

    3 ft. - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    16.6 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
45.7SSS
7.5DAZ
16.6FM
0MWL
45.7SAV
47.5MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
47.5AMH15 0674
7.6SSS
0AMH15 0675
0MWM
3SAV
45.7DAGS
3CS
2DAZMAGNEZIUM H.O COATING start
2DAGS

Properties (6)

additional_info
SC359517
custom_field_two
2
customer
LACSD
datetime
2018-06-13T03:00:26-07:00
documentation
PROPIPE
is_lateral_inspection
false