02 0975_02 0974A _14062018_000736.mp4
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING start
6 ft. - Surface Roughness Increased, from 03 to 09 o'clock, within 8 inches of joint: YES, Start
14.6 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
156.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 328.5 | DAZ | — |
| 3 | DAGS | — |
| 328.5 | DAGS | — |
| 6 | SRI | — |
| 157.5 | TB | — |
| 325.7 | MGO | MAG COATING FLAKING |
| 328.4 | DSC | — |
| 156.7 | SAV | — |
| 331.3 | AMH | 02 0974A |
| 0 | AMH | 02 0975 |
| 3.2 | DAZ | MAGNEZIUM H.O COATING start |
| 0 | MWL | — |
| 14.6 | DSC | — |
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 0 | MWM | — |
| 328.5 | SRI | — |
| 331.3 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |