Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2018, 08:30 AM
  • 14 0381A_14 0381 _07062018_013637.mp4

Date
06/07/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18461
Time
1:30 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5721
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0381A
Downstream MH
14 0381
Dir. of Survey
Downstream
Length Surveyed
124 ft.
Total Length
124 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
120
O&M Index
2
O&M Quick
412D
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
172
Pipe schematic from manhole 14 0381A to 14 0381
MH: 14 0381AMH: 14 0381downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0381A2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"50.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"74.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"98.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"122 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish122 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish122 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish124 ft. AMH - Downstream Manhole, Survey Ends - 14 0381

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
74.7TFC
0MGOCOCKROACHES IN MANHOLE
122DAGS
0MWL
98.6TFA
50.2TFC
122SSS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
21.9TFC
2SAP
0MWM
2DAGS
122SAP
124AMH14 0381
2SSS
0AMH14 0381A

Properties (6)

additional_info
SC359387
custom_field_two
2
customer
LACSD
datetime
2018-06-07T01:30:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false