Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2018, 11:04 AM
  • 14 0392A_14 0392 _07062018_041008.mp4

Date
06/07/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18473
Time
4:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5721
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0392A
Downstream MH
14 0392
Dir. of Survey
Downstream
Length Surveyed
33 ft.
Total Length
33 ft.
Structural Index
3
Structural Quick
3626
Structural Rating
30
O&M Index
2
O&M Quick
4126
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
46
Pipe schematic from manhole 14 0392A to 14 0392
MH: 14 0392AMH: 14 0392downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0392A0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"11 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"15 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"30.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish30.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish33 ft. AMH - Downstream Manhole, Survey Ends - 14 039233 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
30.4DAGS
0MWL
7.2TFC
33AMH14 0392
0AMH14 0392A
2DAGS
2SSS
15TFC
30.4SAP
33MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
11TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
30.4SSS
0MWM
2SAP

Properties (6)

additional_info
SC359387
custom_field_two
2
customer
LACSD
datetime
2018-06-07T04:04:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false