Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 09:50 AM
  • 14 0401_14 0400 _11062018_030333.mp4

Date
06/11/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18483
Time
2:50 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5724
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401
Downstream MH
14 0400
Dir. of Survey
Downstream
Length Surveyed
105 ft.
Total Length
105 ft.
Structural Index
2
Structural Quick
322B
Structural Rating
34
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 14 0401 to 14 0400
MH: 14 0401MH: 14 0400downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04010 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start16.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"25 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"31.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start40.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"64.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"89.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"102.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish102.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish102.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish105 ft. MGO - General Observation - COCKROACHES IN MANHOLE105 ft. AMH - Downstream Manhole, Survey Ends - 14 0400, RUN LIST STATES MH AT 184'.105 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    31.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 14 0400, RUN LIST STATES MH AT 184'.

    105 ft. - Downstream Manhole, Survey Ends - 14 0400, RUN LIST STATES MH AT 184'.

Observations (18)

DistanceCodeObservation
105MGOCOCKROACHES IN MANHOLE
105AMH14 0400, RUN LIST STATES MH AT 184'.
102.6SSS
16.1TFC
89.5TFC
102.6SAP
2SAP
25TBA
40.7TFC
0MWM
105MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH14 0401
2DAGS
0MWL
64.8TFC
0MGOCOCKROACHES IN MANHOLE
102.6DAGS
31.2SSS

Properties (6)

additional_info
SC359390
custom_field_two
2
customer
LACSD
datetime
2018-06-11T02:50:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false