Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 12:03 PM
  • 14 0401A_14 0401 _11062018_050907.mp4

Date
06/11/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18484
Time
5:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5724
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401A
Downstream MH
14 0401
Dir. of Survey
Downstream
Length Surveyed
83 ft.
Total Length
83 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
80
O&M Index
2
O&M Quick
412B
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
116
Pipe schematic from manhole 14 0401A to 14 0401
MH: 14 0401AMH: 14 0401downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0401A2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start22.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"46.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"70.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"82.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish82.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK82.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish82.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish83 ft. AMH - Downstream Manhole, Survey Ends - 14 040183 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWL
82.9DAGS
22.9TFC
0MWM
0AMH14 0401A
2SAP
2SSS
2DAGS
82.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
83AMH14 0401
70.8TFC
82.9SSS
82.9SAP
46.6TFC
83MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC359390
custom_field_two
2
customer
LACSD
datetime
2018-06-11T05:03:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false