Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 10:07 AM
  • 18 0001_18 0784 _11062018_032446.mp4

Date
06/11/2018
W/O
706968
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00713
PipeID
P13816
Time
3:07 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5190
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_706968_TV18059_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0001
Downstream MH
18 0784
Dir. of Survey
Downstream
Length Surveyed
301 ft.
Total Length
301 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 18 0001 to 18 0784
MH: 18 0001MH: 18 0784downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00010 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start13.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start59.1 ft. MGO - General Observation - MAG PEELING OFF68 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"102 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"126.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"209.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"286.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"296.8 ft. MMC - Material Change, Vitrified clay pipe - VCP300.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish300.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish301 ft. AMH - Downstream Manhole, Survey Ends - 18 0784

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    36.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
126.4TF
102TF
0MWM
68TF
36.8SAV
296.8MMCVCP
190.9TF
2.1MGOMAGNEZIUM H.O COATING start
0AMH18 0001
0MWL
300.3SAV
13.4TF
59.1MGOMAG PEELING OFF
224.9TF
286.4TF
300.3DAGS
209.3TF
116.9TF
2.1DAGS
301AMH18 0784

Properties (6)

additional_info
SC359513
custom_field_two
3
customer
LACSD
datetime
2018-06-11T03:07:43-07:00
documentation
PROPIPIE
is_lateral_inspection
false