Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 10, 2018, 04:09 PM
  • H 0405_A 0930_7102018_095744.mp4

Date
07/10/2018
W/O
0716535
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00956
PipeID
P21182
Time
9:09 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0928
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INFLUENT SEWER
City
WHITTIER
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Capital Improvement Program Assesment
Project
20180710SHO_JOA1A_SJC_WRP_INFLUENT_SEWER
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Upstream MH
H 0405
Downstream MH
A 0930
Dir. of Survey
Downstream
Length Surveyed
613 ft.
Total Length
613 ft.
Structural Index
4
Structural Quick
5333
Structural Rating
26
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
26
Pipe schematic from manhole H 0405 to A 0930
MH: H 0405MH: A 0930downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 100012.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES12.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start60.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60.8 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish91.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 12" - open91.8 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: NO263.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 18" - TWO CONNECTIONS SIDE BY SIDE264 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT598 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES606 ft. SRV - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT612.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish612.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish613 ft. AMH - Downstream Manhole, Survey Ends - 1030613 ft. SRV - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (6)

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    12.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    12.2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: NO

    91.8 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT

    264 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES

    598 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT

    606 ft. - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - EVERY JOINT

Observations (17)

DistanceCodeObservation
612.9SSS
598SRV
60.8SSS
0MWM
613AMH1030
613SRV
606SRVEVERY JOINT
91.8SAP
263.7TFCTWO CONNECTIONS SIDE BY SIDE
612.9SAP
60.8SAV
0MWL
264SAPEVERY JOINT
0AMH1000
12.2SRV
12.2SAV
91.2TFopen

Properties (7)

additional_info
RFIR
custom_field_three
REBAR
custom_field_two
2
customer
LACSD
datetime
2018-07-10T09:09:53-07:00
documentation
OBREGON, BRAR, VENDRYES, PARAISO
is_lateral_inspection
false