Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 9, 2018, 09:46 AM
  • Section#2_29 0483_29 0482__792018__ I0030.mp4

Date
07/09/2018
W/O
0711163
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00789
PipeID
P24529
Time
2:46 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0030
Sewer Name
29 CHERRY AVENUE TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Capital Improvement Program Assesment
Project
20180709MDM_CHERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0483
Downstream MH
29 0482
Dir. of Survey
Downstream
Length Surveyed
175.5 ft.
Total Length
175.5 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 29 0483 to 29 0482
MH: 29 0483MH: 29 0482downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:10AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MLC - Lining Change, Other (enter details in Field 39) - LINER START8.1 ft. MGO - General Observation - PIPE LINER105.8 ft. MGO - General Observation - 8" VCP LINED133.2 ft. MWLS - Water Level, Sag in pipe, 5 %of cross sectional area175.5 ft. AMH - Downstream Manhole, Survey Ends - 3:20AM

Observation photos (4)

  • Lining Change, Other (enter details in Field 39) - LINER START

    2 ft. - Lining Change, Other (enter details in Field 39) - LINER START

  • General Observation - PIPE LINER

    8.1 ft. - General Observation - PIPE LINER

  • General Observation - 8" VCP LINED

    105.8 ft. - General Observation - 8" VCP LINED

  • Water Level, Sag in pipe, 5 %of cross sectional area

    133.2 ft. - Water Level, Sag in pipe, 5 %of cross sectional area

Observations (9)

DistanceCodeObservation
2MLCLINER START
175.5AMH3:20AM
133.2MWLS
8.1MGOPIPE LINER
0AMH3:10AM
105.8MGO8" VCP LINED
0MWM
0MGOMH CONN 9:00 ACTIVE
0MWL

Properties (6)

custom_field_three
PIPE IS LINED
custom_field_two
4
customer
LACSD
datetime
2018-07-09T02:46:15-07:00
documentation
MARTIN,OLIVER 111,YOUNG
is_lateral_inspection
false