Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 20, 2019, 04:30 PM
  • 30 0118_30 0117_3202019_105013.mp4

Date
03/20/2019
W/O
0760336
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17821
Time
9:30 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7944
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20190315DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
30 0118
Downstream MH
30 0117
Dir. of Survey
Downstream
Length Surveyed
448.1 ft.
Total Length
448.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 30 0118 to 30 0117
MH: 30 0118MH: 30 0117downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:49 AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start132.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start256.6 ft. MGP - General Photograph395.1 ft. MGP - General Photograph445.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 20% MAG448.1 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)448.1 ft. AMH - Downstream Manhole, Survey Ends - 11:10 AM

Observation photos (5)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    132.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    256.6 ft. - General Photograph

  • General Photograph

    395.1 ft. - General Photograph

Observations (13)

DistanceCodeObservation
448.1MGOGREASE THROUGHOUT THE REACH (5%)
2SZ45% MAG
256.6MGP
0AMH10:49 AM
445.6SSS
448.1AMH11:10 AM
2SSS
445.6CM
0MWL
0MWM
445.6SZ20% MAG
132.7CM
395.1MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-03-20T09:30:07-07:00
documentation
FRANKLIN, IGNACIO
is_lateral_inspection
false