Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2017, 07:49 AM
  • 02 1083_02 1082 _19122017_234956.mp4

Date
12/19/2017
W/O
679272
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03657
Time
11:49 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5284
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
WO_679272_TV02212_JAN2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1083
Downstream MH
02 1082
Dir. of Survey
Downstream
Length Surveyed
326.3 ft.
Total Length
326.3 ft.
Structural Index
3
Structural Quick
523L
Structural Rating
335
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 02 1083 to 02 1082
MH: 02 1083MH: 02 1082downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10830 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COAT3.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start40.7 ft. SRV - Surface Reinforcement Visible, from 08 to 10 o'clock, within 8 inches of joint: YES81.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"162.8 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish162.8 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start316.1 ft. SRV - Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: NO326.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1082326.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish326.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

    40.7 ft. - Surface Reinforcement Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    162.8 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: NO

    316.1 ft. - Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: NO

Observations (15)

DistanceCodeObservation
162.8SAV
326.3AMH02 1082
0MWM
326.3SAP
162.8SAP
316.1SRV
40.7SRV
3.8SSS
2.2SAV
81.7TF
0AMH02 1083
0MWL
2.2MGOMAG COAT
0MGOCONNECTION AT MH 3 O'CLOCK
326.3SSS

Properties (6)

additional_info
SC346761
custom_field_two
2
customer
LACSD
datetime
2017-12-19T23:49:52-08:00
documentation
PROPIPE
is_lateral_inspection
false