Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 11, 2017, 12:43 PM
  • 18 0126_18 0125 _11122017_044359.mp4

Date
12/11/2017
W/O
673944
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00695
PipeID
P13947
Time
4:43 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5271
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
29
Purpose
Routine Assessment
Project
WO_673944_TV18100_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
18 0126
Downstream MH
18 0125
Dir. of Survey
Downstream
Length Surveyed
427.7 ft.
Total Length
427.7 ft.
Structural Index
3
Structural Quick
5L3P
Structural Rating
738
O&M Index
3
O&M Quick
3P00
O&M Rating
252
Overall Index
3
Overall Quick
Overall Rating
990
Pipe schematic from manhole 18 0126 to 18 0125
MH: 18 0126MH: 18 0125downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01260.1 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start110.7 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES117.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start427.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish427.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish427.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish427.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0125427.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    8.8 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    110.7 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    117.7 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
427.7SRV
427.7SAP
427.7DSZ
6.1SSS
110.7SRV
427.7AMH18 0125
117.7SRV
0MWL
0.1MWM
2.1SAP
427.7SSS
8.8DSZ
0AMH18 0126

Properties (6)

additional_info
SC346298
custom_field_two
2
customer
LACSD
datetime
2017-12-11T04:43:18-08:00
documentation
PROPIPE
is_lateral_inspection
false