Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 29, 2017, 07:36 AM
  • 02 1296_02 1295_28112017_233729.mp4

Date
11/28/2017
W/O
673943
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00238
PipeID
P03813
Time
11:36 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5053
Sewer Name
02 BELVEDERE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
WO_673943_TV02329_DEC2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1296
Downstream MH
02 1295
Dir. of Survey
Downstream
Length Surveyed
287.3 ft.
Total Length
287.3 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
171
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
172
Pipe schematic from manhole 02 1296 to 02 1295
MH: 02 1296MH: 02 1295downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 12960 ft. MWM - Water Mark, 15 %of cross sectional area3.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"11.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"13.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"87.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"98 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.5 ft. RFL - Roots Fine Lateral, at 02 o'clock131.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"146 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6", 6"249.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"255.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"287.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish287.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK287.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1295

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
3.1CM
131.5RFL
205.8TF
211.1TF
11.3TF
90.6TF
131.5TF
287.2CM
8TF
287.3MGOCONNECTION AT MH 3 O'CLOCK
146TF
0MWL
13.2TF
0AMH02 1296
87.8TF
129.4TFC
249.5TFC
51.8TF
287.3AMH02 1295
218.5TB
0MWM
98TB
255.9TFC
162.6TF

Properties (6)

additional_info
SC346282
custom_field_two
3
customer
LACSD
datetime
2017-11-28T23:36:05-08:00
documentation
PROPIPE
is_lateral_inspection
false