Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2018, 11:56 AM
  • 22 0464_22 0463_1102018_044805.mp4

Date
01/10/2018
W/O
0682841
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00816
PipeID
P16802
Time
3:56 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0723
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
IRWINDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20180110MDM_LARK_ELLEN_TRUNK_SECTS_4_5_6
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0464
Downstream MH
22 0463
Dir. of Survey
Downstream
Length Surveyed
254.6 ft.
Total Length
254.6 ft.
Structural Index
3
Structural Quick
4122
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0464 to 22 0463
MH: 22 0464MH: 22 0463downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:45AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.1 ft. MGO - General Observation - MAG COAT 30% START 8:00 TO 4:00106.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED114.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open187.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open254.1 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG254.1 ft. MGO - General Observation - MAG COAT 30% FINISH254.1 ft. MGO - General Observation - MH CONN 3:00 ACTIVE254.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE254.6 ft. AMH - Downstream Manhole, Survey Ends - 5:05AM

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT 30% START 8:00 TO 4:00

    12.1 ft. - General Observation - MAG COAT 30% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    106.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (15)

DistanceCodeObservation
0AMH4:45AM
254.1SAMSEVERE AGG
0MWM
0MWL
254.1MGOMAG COAT 30% FINISH
254.6AMH5:05AM
187.1TFOpen
12.1MGOMAG COAT 30% START 8:00 TO 4:00
2SSS
254.1MGOMH CONN 3:00 ACTIVE
254.1SSSPEELING CONCRETE
0MGOMH CONN 3:00 ACTIVE
2SAM
114.5TFOpen
106.4SSSPEELING CONCRETE SEVERE AGG ATTACHED

Properties (6)

custom_field_three
SEVERE AGG MISSING
custom_field_two
3
customer
LACSD
datetime
2018-01-10T03:56:43-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false