Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2018, 11:15 AM
  • 22 0466_22 0465_1102018_032018.mp4

Date
01/10/2018
W/O
0682841
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00816
PipeID
P16804
Time
3:15 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0723
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
IRWINDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20180110MDM_LARK_ELLEN_TRUNK_SECTS_4_5_6
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
22 0466
Downstream MH
22 0465
Dir. of Survey
Downstream
Length Surveyed
263.9 ft.
Total Length
263.9 ft.
Structural Index
3
Structural Quick
4221
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 22 0466 to 22 0465
MH: 22 0466MH: 22 0465downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 60% START 9:00 TO 3:002 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG43 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Active103.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open107.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open111.4 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG168.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open188.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped213.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped222.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active263.3 ft. MGO - General Observation - MAG COAT 60% FINISH263.3 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG263.3 ft. MGO - General Observation - MH CONN 9:00 ACTIVE263.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE263.9 ft. AMH - Downstream Manhole, Survey Ends - 3:35AM

Observation photos (4)

  • General Observation - MAG COAT 60% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 60% START 9:00 TO 3:00

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    111.4 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (20)

DistanceCodeObservation
111.4SAMSEVERE AGG
0MWM
43TFActive
263.3MGOMAG COAT 60% FINISH
0AMH3:15AM
213.2TFCCapped
0MGOMH CONN 9:00 ACTIVE
263.3SAMSEVERE AGG
168.4TFOpen
2MGOMAG COAT 60% START 9:00 TO 3:00
107.9TFOpen
263.9AMH3:35AM
188.8TFCCapped
2SSSPEELING CONCRETE
103.8TFOpen
222.5TFActive
263.3MGOMH CONN 9:00 ACTIVE
0MWL
2SAMSEVERE AGG
263.3SSSPEELING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG MISSING
custom_field_two
3
customer
LACSD
datetime
2018-01-10T03:15:57-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false