Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2018, 10:05 AM
  • 22 0467_22 0466_1102018_023732.mp4

Date
01/10/2018
W/O
0682841
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00816
PipeID
P16805
Time
2:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0723
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
IRWINDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20180110MDM_LARK_ELLEN_TRUNK_SECTS_4_5_6
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
22 0467
Downstream MH
22 0466
Dir. of Survey
Downstream
Length Surveyed
278.5 ft.
Total Length
278.5 ft.
Structural Index
4
Structural Quick
4321
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
14
Pipe schematic from manhole 22 0467 to 22 0466
MH: 22 0467MH: 22 0466downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:35AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG8 ft. MGO - General Observation - MAG COAT 60% START 9:00 TO 3:0048.8 ft. MGO - General Observation - MAG COAT 70% START68.5 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG81.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open85.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open141.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped198.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Active202.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open263.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open274.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG278 ft. MGO - General Observation - MH CONN 9:00 ACTIVE278 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE278 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG278 ft. MGO - General Observation - MAG COAT 70% FINISH278.5 ft. AMH - Downstream Manhole, Survey Ends - 3:O5AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 60% START 9:00 TO 3:00

    8 ft. - General Observation - MAG COAT 60% START 9:00 TO 3:00

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    68.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    274.1 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (21)

DistanceCodeObservation
85.4TFOpen
8MGOMAG COAT 60% START 9:00 TO 3:00
198.3TFActive
0AMH2:35AM
141.6TFCCapped
2SSSPEELING CONCRETE
48.8MGOMAG COAT 70% START
278.5AMH3:O5AM
81.1TFOpen
202.7TFOpen
0MWL
278MGOMH CONN 9:00 ACTIVE
274.1SAMSEVERE AGG
278SSSPEELING CONCRETE
0MGOMH CONN ACTIVE 9:00
263.2TFOpen
0MWM
2SAMSEVERE AGG
278SAMSEVERE AGG
68.5SAMSEVERE AGG
278MGOMAG COAT 70% FINISH

Properties (6)

custom_field_three
SEVERE AGG MISSING
custom_field_two
3
customer
LACSD
datetime
2018-01-10T02:05:04-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false