Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2018, 10:36 AM
  • Section#19_05 0300_05 0299__182018__G6909.mp4

Date
01/08/2018
W/O
0682842
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05508
Time
2:36 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6909
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20180105MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Upstream MH
05 0300
Downstream MH
05 0299
Dir. of Survey
Downstream
Length Surveyed
329.7 ft.
Total Length
329.7 ft.
Structural Index
3
Structural Quick
3M21
Structural Rating
206
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
210
Pipe schematic from manhole 05 0300 to 05 0299
MH: 05 0300MH: 05 0299downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:55AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT80% 9:00 TO 3:0024.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT68.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - PRJECTING SEVERE AGG82.1 ft. MWM - Water Mark, 60 %of cross sectional area263.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG263.8 ft. MGO - General Observation - MAG COAT 80% FINISH263.8 ft. MWM - Water Mark, 20 %of cross sectional area329 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG329.7 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT80% 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT80% 9:00 TO 3:00

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

    24.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - PRJECTING SEVERE AGG

    68.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - PRJECTING SEVERE AGG

  • Water Mark, 60 %of cross sectional area

    82.1 ft. - Water Mark, 60 %of cross sectional area

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    263.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - MAG COAT 80% FINISH

    263.8 ft. - General Observation - MAG COAT 80% FINISH

Observations (16)

DistanceCodeObservation
68.5SAPPRJECTING SEVERE AGG
329.7AMH3:25AM
329SAPSEVERE AGG
82.1MWM
2SSSBLISTERING PEELING CONCRETE
263.8SAPSEVERE AGG
0AMH2:55AM
2SAPSEVERE AGG
263.8MGOMAG COAT 80% FINISH
0MWM
0MGOMH CONN 9:00 ACTIVE
263.8MWM
0MWL
2MGOMAG COAT80% 9:00 TO 3:00
24.5SAPSEVERE AGG UNDER MAG COAT
0MGOMH CONN 3:00 ACTIVE

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-01-08T02:36:49-08:00
documentation
MARTIN,MANANEM,REVELES,OLIVER 111
is_lateral_inspection
false