Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 6, 2018, 09:03 AM
  • Section#10_05 0283_05 0282__162018__G6907.mp4

Date
01/06/2018
W/O
0682489
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05491
Time
1:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6907
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180105MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0283
Downstream MH
05 0282
Dir. of Survey
Downstream
Length Surveyed
327.5 ft.
Total Length
327.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
332
Pipe schematic from manhole 05 0283 to 05 0282
MH: 05 0283MH: 05 0282downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:00AM0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE SWOOLEN2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG125.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE234.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK259.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG327.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG327.1 ft. MGO - General Observation - MH CONN 3:00 ACTIVE327.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING CONCRETE327.1 ft. MGO - General Observation - MH CONN 9:00 ACTIVE327.5 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE SWOOLEN

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE SWOOLEN

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    125.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    259.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (15)

DistanceCodeObservation
0MWM
0AMH3:00AM
327.1SAPSEVERE AGG
0MGOMH CONN ACTIVE 9:00
327.1MGOMH CONN 3:00 ACTIVE
327.1SSSBLISTERING CONCRETE
259.5SAPSEVERE AGG
327.1MGOMH CONN 9:00 ACTIVE
0MGOMH CONN 3:00 ACTIVE
2SSSBLISTERING CONCRETE SWOOLEN
327.5AMH3:25AM
125.4SSSBLISTERING CONCRETE
234.8DSZROCK
0MWL
2SAPSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-01-06T01:03:33-08:00
documentation
MARTIN,MANANEM,REVELES,OLIVER 111
is_lateral_inspection
false