Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 6, 2018, 08:45 AM
  • Section#7_05 0286_05 0285__162018__G6907.mp4

Date
01/06/2018
W/O
0682489
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05494
Time
12:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6907
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180105MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0286
Downstream MH
05 0285
Dir. of Survey
Downstream
Length Surveyed
24.8 ft.
Total Length
24.8 ft.
Structural Index
3
Structural Quick
3424
Structural Rating
20
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 05 0286 to 05 0285
MH: 05 0286MH: 05 0285downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:20AM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE8 ft. MGO - General Observation - 27" RCP13.5 ft. MGO - General Observation - MAG COAT 50% START 8:00 TO 4:0024 ft. MGO - General Observation - MAG COAT 50% FINISH24 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG24 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE24 ft. MGO - General Observation - MH CONN 3:00 OPEN24 ft. MGO - General Observation - MH CONN 9:00 STUB24.8 ft. AMH - Downstream Manhole, Survey Ends - 1:30AM

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - 27" RCP

    8 ft. - General Observation - 27" RCP

  • General Observation - MAG COAT 50% START 8:00 TO 4:00

    13.5 ft. - General Observation - MAG COAT 50% START 8:00 TO 4:00

Observations (15)

DistanceCodeObservation
24MGOMAG COAT 50% FINISH
24SAPSEVERE AGG
24SSSBLISTERING PEELING CONCRETE
0MGOMH CONN 9:00 ACTIVE
0MGOMH CONN 3:00 ACTIVE
0MWL
2SAPSEVERE AGG
8MGO27" RCP
24.8AMH1:30AM
2SSSBLISTERING PEELING CONCRETE
0MWM
24MGOMH CONN 3:00 OPEN
0AMH1:20AM
13.5MGOMAG COAT 50% START 8:00 TO 4:00
24MGOMH CONN 9:00 STUB

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-01-06T00:45:49-08:00
documentation
MARTIN,MANANEM,REVELES,OLIVER 111
is_lateral_inspection
false