Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2018, 09:16 AM
  • Section#5_05 0288_05 0287__152018__G6906.mp4

Date
01/05/2018
W/O
0682842
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05496
Time
1:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6906
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180105MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0288
Downstream MH
05 0287
Dir. of Survey
Downstream
Length Surveyed
119.9 ft.
Total Length
119.9 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
124
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
124
Pipe schematic from manhole 05 0288 to 05 0287
MH: 05 0288MH: 05 0287downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 5:10AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE50.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG64.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG104.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG119.3 ft. MGO - General Observation - MH CONN 9:00 ACTIVE119.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE119.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG119.9 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    50.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    64.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    104.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (13)

DistanceCodeObservation
119.3MGOMH CONN 9:00 ACTIVE
2SAPSEVERE AGG
0MGOMH CONN 9:00 ACTIVE
0AMH5:10AM
2SSSBLISTERING PEELING CONCRETE
104.2SAPSEVERE AGG
119.9AMH5:25AM
50.6SAPSEVERE AGG
119.3SSSBLISTERING PEELING CONCRETE
0MWM
119.3SAPSEVERE AGG
0MWL
64.9SAPSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-01-05T01:16:48-08:00
documentation
MARTIN,MANANEM,REVELES,OLIVER 111
is_lateral_inspection
false