Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2018, 09:01 AM
  • 22 0493_22 0492 _20042018_022506.mp4

Date
04/20/2018
W/O
695664
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00800
PipeID
P16832
Time
2:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5573
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_695664_TV22031_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0493
Downstream MH
22 0492
Dir. of Survey
Downstream
Length Surveyed
171.7 ft.
Total Length
171.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 22 0493 to 22 0492
MH: 22 0493MH: 22 0492downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 04930 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start41.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"45 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"93.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"96.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"144.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"147.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"169 ft. SAP - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Finish171.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0492171.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
41.9TFC
45TFA
144.9TFC
171.7AMH22 0492
0AMH22 0493
2SAP
93.1TFC
171.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
96.6TFC
169SAP
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
147.8TFA

Properties (6)

additional_info
SC358532
custom_field_two
2
customer
LACSD
datetime
2018-04-20T02:01:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false