Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2018, 07:35 AM
  • 22 0496_22 0495 _20042018_004411.mp4

Date
04/20/2018
W/O
695664
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00800
PipeID
P16835
Time
12:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5573
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_695664_TV22031_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0496
Downstream MH
22 0495
Dir. of Survey
Downstream
Length Surveyed
166.8 ft.
Total Length
166.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0496 to 22 0495
MH: 22 0496MH: 22 0495downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04960 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start42.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"45.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"74.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start94 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"97.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"128.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"142.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"145.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"159.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish164.2 ft. SAP - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Finish166.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0495

Observation photos (2)

  • Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 02 to 10 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    74.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
45.9TFC
42.5TFC
164.2SAP
2SAP
94TFC
0MWL
0MWM
0AMH22 0496
128.5TBA
159.9CM
142.5TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
97.1TFC
145.3TFC
74.8CM
166.8AMH22 0495

Properties (6)

additional_info
SC358532
custom_field_two
2
customer
LACSD
datetime
2018-04-20T00:35:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false