Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 23, 2018, 08:51 AM
  • 22 0484_22 0483 _23042018_020319.mp4

Date
04/23/2018
W/O
695664
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00800
PipeID
P16823
Time
1:51 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5575
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_695664_TV22031_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0484
Downstream MH
22 0483
Dir. of Survey
Downstream
Length Surveyed
157.8 ft.
Total Length
157.8 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
93
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
93
Pipe schematic from manhole 22 0484 to 22 0483
MH: 22 0484MH: 22 0483downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04840 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start5.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"8.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"57.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"60.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"105.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"155.6 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish157.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0483

Observation photos (1)

  • Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
155.6SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
5.6TFC
8.9TFC
105.7TFC
0MWM
0AMH22 0484
57.2TFC
0MWL
60.2TF
2SAP
108.7TFC
157.8AMH22 0483

Properties (6)

additional_info
SC358534
custom_field_two
2
customer
LACSD
datetime
2018-04-23T01:51:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false