Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2018, 09:05 AM
  • 29 0203_29 0202 _29012018_012927.mp4

Date
01/29/2018
W/O
684976
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01025
PipeID
P24102
Time
1:05 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5425
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_684976_TV29048_FEB2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0202
Downstream MH
29 0203
Dir. of Survey
Upstream
Length Surveyed
294.9 ft.
Total Length
294.9 ft.
Structural Index
2
Structural Quick
3211
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0202 to 29 0203
MH: 29 0202MH: 29 0203upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 020320 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"30.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"33.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"42.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"66 ft. CM - Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES80.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.7 ft. CC - Crack Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES126.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"129 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"182 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"228.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES282 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"284.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"294.8 ft. MWM - Water Mark, 5 %of cross sectional area294.9 ft. AMH - Downstream Manhole, Survey Begins - 29 0202294.9 ft. MWL - Water Level, 5 %of cross sectional area294.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    17.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES

    176.2 ft. - Crack Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES

    228.9 ft. - Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
0.1MWM
264.2TFC
228.9CM
66.2TFC
17.4CM
0AMH29 0202
274.9TF
0MWL
10.4TFC
63.6TFC
12.9TFC
112.9TFC
294.9AMH29 0203
115.8TFC
165.9TFC
261.5TFC
168.4TFC
0MGOCONNECTION AT MH 9 O'CLOCK
176.2CC
214.5TFC
211.9TFC
252.1TB

Properties (6)

additional_info
SC347060
custom_field_two
3
customer
LACSD
datetime
2018-01-29T01:05:28-08:00
documentation
PROPIPE
is_lateral_inspection
false