Date
01/29/2018
W/O
684976
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01025
PipeID
P24313
Time
11:08 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5426
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_684976_TV29048_FEB2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0301
Downstream MH
29 0166
Dir. of Survey
Downstream
Length Surveyed
325.1 ft.
Total Length
325.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0301 to 29 0166
MH: 29 0301MH: 29 0166downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 03010 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area2 ft. MGO - General Observation - SPALLING FROM 8 TO 4 O'CLOCK @ 2' TO 324'40.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"44.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"138.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.3 ft. MGO - General Observation - INTRUDING CONNECTION @ 3 O'CLOCK - .5"183.3 ft. TS - Tap Saddle, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"194 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"239.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"288.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"292 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"325.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0166325.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK325.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observations (21)

DistanceCodeObservation
190.2TFC
237.5TFC
141.7TFC
239.8TFC
183.3MGOINTRUDING CONNECTION @ 3 O'CLOCK - .5"
325.2AMH29 0166
183.3TS
325.2MGOCONNECTION AT MH 9 O'CLOCK
2MGOSPALLING FROM 8 TO 4 O'CLOCK @ 2' TO 324'
0AMH29 0301
95.2TFC
0MWL
0MWM
138.8TFC
92.3TFC
288.4TFC
325.2MGOCONNECTION AT MH 3 O'CLOCK
292TFC
40.1TF
194TFC
44.1TFC