Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2018, 10:46 AM
  • 29 0190_29 0189 _26012018_030102.mp4

Date
01/26/2018
W/O
684976
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01025
PipeID
P24087
Time
2:46 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5423
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_684976_TV29048_FEB2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0190
Downstream MH
29 0189
Dir. of Survey
Downstream
Length Surveyed
314.9 ft.
Total Length
314.9 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
177
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
177
Pipe schematic from manhole 29 0190 to 29 0189
MH: 29 0190MH: 29 0189downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 01900 ft. MWM - Water Mark, 5 %of cross sectional area2 ft. MGO - General Observation - SPALLING FROM 8 TO 4 O'CLOCK - @ 2' MARK TO 314'14 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES23 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES29 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start69.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"72.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"72.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"178.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"228.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"276 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"278.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"314.9 ft. AMH - Downstream Manhole, Survey Ends - 29 0189314.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    14 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    23 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    29 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
226.2TFC
0MWL
314.9AMH29 0189
29CM
2MGOSPALLING FROM 8 TO 4 O'CLOCK - @ 2' MARK TO 314'
276TFC
178.4TFC
0AMH29 0190
278.6TFC
75.1TFC
228.6TFC
23CM
72.2TF
301.9TF
14CM
314.9CM
72.2TB
125.8TF
128.2TF
69.1TB
175.8TFC
0MWM

Properties (6)

additional_info
SC347058
custom_field_two
3
customer
LACSD
datetime
2018-01-26T02:46:41-08:00
documentation
PROPIPE
is_lateral_inspection
false