Search
Uploads
Inspections
Wastewater/Activity/PacpInspection/1.0
May 8, 2018, 04:31 PM
Section#1_J 0220_J 0218__582018__I003.mp4
Date
05/08/2018
W/O
0688897
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00057
PipeID
P11464
Time
9:31 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
—
Pre-Cleaning
Not Known
Media Label
I003
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
SAN PEDRO
Loc. details
Woods
Location Code
E
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
48
Purpose
Capital Improvement Program Assesment
Project
20180508SHO_JOINT_OUTFALL_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0220
Downstream MH
J 0218
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
—
Overall Rating
6
Pipe schematic from manhole J 0220 to J 0218
MH: J 0220
MH: J 0218
downstream
0 ft. MWM - Water Mark, 55 %of cross sectional area
0 ft. MWL - Water Level, 45 %of cross sectional area
0 ft. AMH - Upstream Manhole, Survey Begins - 1025
2 ft. MSA - Survey Abandoned - LOOKING D/S TO MH J 218
2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
Observation photos (1)
2 ft. - Survey Abandoned - LOOKING D/S TO MH J 218
All inspections of P11464
Work order 0688897
Observations (5)
Distance
Code
Observation
2
MSA
LOOKING D/S TO MH J 218
2
SSS
—
0
MWM
—
0
MWL
—
0
AMH
1025
Properties (7)
additional_info
RFIR, LOOKING D/S
custom_field_three
LOOKING D/S, SPALLING
custom_field_two
3
customer
LACSD
datetime
2018-05-08T09:31:14-07:00
documentation
OBREGON, SHADLER, BRAR, PARAISO
is_lateral_inspection
false