Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2018, 07:20 PM
  • Section#3_J 0217_J 0216__572018__I001.mp4

Date
05/07/2018
W/O
0688897
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00057
PipeID
P11461
Time
12:20 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I001
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
SAN PEDRO
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
48
Purpose
Capital Improvement Program Assesment
Project
20180507SHO_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0217
Downstream MH
J 0216
Dir. of Survey
Downstream
Length Surveyed
1363.4 ft.
Total Length
1363.4 ft.
Structural Index
2
Structural Quick
2u1u
Structural Rating
808
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
808
Pipe schematic from manhole J 0217 to J 0216
MH: J 0217MH: J 0216downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12250 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area4.5 ft. MGO - General Observation - 70% MAG COAT INTACT10 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start1345.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"1360.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1360.6 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1363.4 ft. AMH - Downstream Manhole, Survey Ends - 0225

Observation photos (2)

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
1360.6SSS
1360.6SRI
4.5MGO70% MAG COAT INTACT
1345.6TFA
0AMH1225
0MWL
16SSS
1363.4AMH0225
0MWM
10SRI

Properties (7)

additional_info
RFIR
custom_field_three
RFIR, SPALLING THROUGHOUT
custom_field_two
3
customer
LACSD
datetime
2018-05-07T12:20:42-07:00
documentation
OBREGON, SHADLER, BRAR, PARAISO
is_lateral_inspection
false