Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2018, 05:10 PM
  • C 0120_C 0119B_572018_111544.mp4

Date
05/07/2018
W/O
0694536
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00127
PipeID
P09643
Time
10:10 AM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7704
Sewer Name
C JOINT OUTFALL C - UNIT 4B
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20180507DF_JOINT_OUTFALL_C_UNIT_4B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
C 0120
Downstream MH
C 0119B
Dir. of Survey
Downstream
Length Surveyed
742.8 ft.
Total Length
742.8 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole C 0120 to C 0119B
MH: C 0120MH: C 0119Bdownstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:14 AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 35% MAG2 ft. SAPC - Surface Aggregate Projecting Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"151.3 ft. MGP - General Photograph251.5 ft. MGP - General Photograph444.6 ft. MGP - General Photograph444.7 ft. SRCC - Surface Reinforcement Corroded Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES600.9 ft. MGP - General Photograph741 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish741 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish741.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish742 ft. MGP - General Photograph - ZOOMED MH(C 0119B)742.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 35% MAG742.4 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish742.4 ft. SAPC - Surface Aggregate Projecting Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish742.8 ft. AMH - Downstream Manhole, Survey Ends - 11:42 AM (ZOOMED)

Observation photos (12)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 35% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 35% MAG

  • Surface Aggregate Projecting Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    151.3 ft. - General Photograph

  • General Photograph

    251.5 ft. - General Photograph

  • General Photograph

    444.6 ft. - General Photograph

  • Surface Reinforcement Corroded Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES

    444.7 ft. - Surface Reinforcement Corroded Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    600.9 ft. - General Photograph

  • Downstream Manhole, Survey Ends - 11:42 AM (ZOOMED)

    742.8 ft. - Downstream Manhole, Survey Ends - 11:42 AM (ZOOMED)

Observations (23)

DistanceCodeObservation
0MWL
742.4SZ35% MAG
444.7SRCC
2SRV
2SAVC
35.6TFA
151.3MGP
741SSS
741SAVC
2DAR
2SZ35% MAG
742.8AMH11:42 AM (ZOOMED)
600.9MGP
0AMH11:14 AM
742.4DAR
742.4SAPC
2SAPC
251.5MGP
742MGPZOOMED MH(C 0119B)
0MWM
741.1SRV
2SSS
444.6MGP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING, REINFORCEMENT CORR
custom_field_two
2
customer
LACSD
datetime
2018-05-07T10:10:44-07:00
documentation
FRANKLIN, IGNACIO
is_lateral_inspection
false