Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2018, 11:50 AM
  • Section#11_18 0850_18 0849__5102018__I0006.mp4

Date
05/10/2018
W/O
0701110
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14705
Time
4:50 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0006
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
34
Purpose
Capital Improvement Program Assesment
Project
20180504MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Upstream MH
18 0850
Downstream MH
18 0849
Dir. of Survey
Downstream
Length Surveyed
54.8 ft.
Total Length
54.8 ft.
Structural Index
3
Structural Quick
4C2A
Structural Rating
110
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
110
Pipe schematic from manhole 18 0850 to 18 0849
MH: 18 0850MH: 18 0849downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MGO - General Observation - MAG COAT 60% START 8:00 TO 4:000 ft. MGO - General Observation - MH CONN 3:00 ACTIVE2 ft. SAM - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG54.6 ft. MGO - General Observation - MAG COAT 60% FINISH54.6 ft. SAM - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG54.6 ft. SAM - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG54.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE54.8 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM

Observation photos (4)

  • General Observation - MAG COAT 60% START 8:00 TO 4:00

    0 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00

  • Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (14)

DistanceCodeObservation
2SAMSEVERE AGG
0MGOMH CONN 9:00 ACTIVE
54.6MGOMAG COAT 60% FINISH
2SSSBLISTERING PEELING CONCRETE
54.6SAMSEVERE AGG
2SAMSEVERE AGG
0MWL
0MWM
54.6SAMSEVERE AGG
0AMH4:50AM
0MGOMAG COAT 60% START 8:00 TO 4:00
54.8AMH5:00AM
0MGOMH CONN 3:00 ACTIVE
54.6SSSBLISTERING PEELING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG MISSING
custom_field_two
3
customer
LACSD
datetime
2018-05-10T04:50:00-07:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false