Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 4, 2018, 11:18 AM
  • Section#1_18 0866_18 0865__542018__G6996.mp4

Date
05/04/2018
W/O
0701634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14718
Time
4:18 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6996
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
34
Purpose
Routine Assessment
Project
20180504MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
18 0866
Downstream MH
18 0865
Dir. of Survey
Downstream
Length Surveyed
1061.5 ft.
Total Length
1061.5 ft.
Structural Index
2
Structural Quick
3g2i
Structural Rating
1024
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
1024
Pipe schematic from manhole 18 0866 to 18 0865
MH: 18 0866MH: 18 0865downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:20AM2 ft. MGO - General Observation - MAG COAT 80% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE14.4 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC19.4 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC42.1 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG104.4 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES104.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC144.4 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG160.5 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG475 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG736.4 ft. MGO - General Observation - 48" RCP759.6 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVEWRE AGG1032.8 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES1060.6 ft. MGO - General Observation - MH CONN 9:00 ACTIVE1060.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG1060.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE1061.5 ft. AMH - Downstream Manhole, Survey Ends - 6:00AM

Observation photos (13)

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    14.4 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    19.4 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

    42.1 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

    104.4 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    104.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    144.4 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

    160.5 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    475 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Observation - 48" RCP

    736.4 ft. - General Observation - 48" RCP

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVEWRE AGG

    759.6 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVEWRE AGG

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES

    1032.8 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
1032.8SAP
0MWL
0MWM
1061.5AMH6:00AM
2MGOMAG COAT 80% START
14.4SAVSEVERE AGG SPORATIC
736.4MGO48" RCP
475SAPSEVERE AGG
160.5SAVSEVERE AGG
144.4SAVSEVERE AGG
1060.6MGOMH CONN 9:00 ACTIVE
104.4SAV
1060.6SAVSEVERE AGG
759.6SAPSEVEWRE AGG
2SSSBLISTERING PEELING CONCRETE
1060.6SSSBLISTERING PEELING CONCRETE
104.4SAVSEVERE AGG SPORATIC
19.4SAVSEVERE AGG SPORATIC
0AMH4:20AM
42.1SAVSEVERE AGG

Properties (6)

custom_field_three
PROJECTING SEVERE AGG
custom_field_two
3
customer
LACSD
datetime
2018-05-04T04:18:03-07:00
documentation
MARTIN,MANANES,REVELES