Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2018, 02:21 PM
  • 15 0445_15 0444_332018_062704.mp4

Date
03/03/2018
W/O
0692645
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00621
PipeID
P12370
Time
6:21 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0765
Sewer Name
15 POTRERO AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Capital Improvement Program Assesment
Project
20180302MDM_POTRERO_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
15 0445
Downstream MH
15 0444
Dir. of Survey
Downstream
Length Surveyed
275.9 ft.
Total Length
275.9 ft.
Structural Index
3
Structural Quick
4234
Structural Rating
26
O&M Index
4
O&M Quick
5131
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
34
Pipe schematic from manhole 15 0445 to 15 0444
MH: 15 0445MH: 15 0444downstream0 ft. MWL - Water Level, 80 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 6:25AM0 ft. MWM - Water Mark, 90 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE GRITE5.1 ft. H - Hole, from 11 to 01 o'clock, within 8 inches of joint: YES5.3 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - MODERATE6.4 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTCHES20 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG20 ft. MWL - Water Level, 10 %of cross sectional area20 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE20 ft. MWM - Water Mark, 20 %of cross sectional area20 ft. MGO - General Observation - MAG COAT 70% START 8:00 TO 4:0020 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE GRITE20 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG20 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - THIN PEELING CONCRETE47.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open81 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active110.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped115.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SLIGHT AGG124.3 ft. MMC - Material Change, Vitrified clay pipe129.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active156.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Open170.1 ft. MMC - Material Change, Concrete pipe (non-reinfored)182.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped209.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped233.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active260.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped275.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT AGG275.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - THIN PEELING CONCRETE275.9 ft. AMH - Downstream Manhole, Survey Ends - 7:15AM

Observation photos (10)

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Water Level, Sag in pipe, 50 %of cross sectional area

    2 ft. - Water Level, Sag in pipe, 50 %of cross sectional area

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start -  PEELING CONCRETE

    2 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Hole, from 11 to 01 o'clock, within 8 inches of joint: YES

    5.1 ft. - Hole, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - MODERATE

    5.3 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - MODERATE

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTCHES

    6.4 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTCHES

  • General Observation - MAG COAT 70% START 8:00 TO 4:00

    20 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG

    20 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG

  • Material Change, Vitrified clay pipe

    124.3 ft. - Material Change, Vitrified clay pipe

  • Material Change, Concrete pipe (non-reinfored)

    170.1 ft. - Material Change, Concrete pipe (non-reinfored)

Observations (35)

DistanceCodeObservation
129.8TFActive
209.9TFCCapped
6.4SSSPEELING CONCRETE SEVERE AGG ATTCHES
20SAPSEVERE AGG
170.1MMC
47.9TFOpen
20MWL
0MWL
20SSSPEELING CONCRETE
2SAPSEVERE AGG
110.9TFCCapped
233.8TFActive
115.2SAVSLIGHT AGG
5.3FMMODERATE
260.7TFCCapped
0MGOConn. @ Mh, 9 O' Clock. Capped
275.7SAVSLIGHT AGG
0MGOConn. @ Mh, 3 O' Clock. Active
0AMH6:25AM
20MWM
2MWLS
2SSSPEELING CONCRETE
2DSZSLUDGE GRITE
20MGOMAG COAT 70% START 8:00 TO 4:00
5.1H
124.3MMC
20DSZSLUDGE GRITE
156.3TFOpen
275.9AMH7:15AM
182.8TFCCapped
20SAVSLIGHT AGG
275.7SSSTHIN PEELING CONCRETE
20SSSTHIN PEELING CONCRETE
81TFActive
0MWM

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTCHED-SMAII HOLE
custom_field_two
2
customer
LACSD
datetime
2018-03-03T06:21:59-08:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection