Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 22, 2021, 10:21 AM
  • 05 0558_05 0557A_01222021_023848.mp4

Date
01/22/2021
W/O
865324
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00460
PipeID
P26433
Time
2:21 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8503
Sewer Name
05 INGLEWOOD TRUNK #2
City
INGELWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
WO_865324_TV05047_DEC2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
05 0558
Downstream MH
05 0557A
Dir. of Survey
Downstream
Length Surveyed
180.3 ft.
Total Length
180.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 05 0558 to 05 0557A
MH: 05 0558MH: 05 0557Adownstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 05582 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start96.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN178 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish180.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0557A

Observations (9)

DistanceCodeObservation
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
96.4TFOPEN
0MWL
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
180.3AMH05 0557A
2DAGS
178DAGS
0MWM
0AMH05 0558

Properties (8)

additional_info
630138012221001
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-01-22T02:21:13-08:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP