03 0609_C 0070_01052021_040814.mp4
2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Infiltration Gusher, from 11 to 01 o'clock, within 8 inches of joint: NO - POSSIBLY INFILTRATION @ A JOINT - MINERAL / CRYSTALS BUILD-UP OBSERVED
17 ft. - Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
17 ft. - Hole, at 12 o'clock, within 8 inches of joint: NO
21 ft. - Hole, at 12 o'clock, within 8 inches of joint: NO
68.6 ft. - Survey Abandoned - CAM BLKD BY 20% GREASE
68.6 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 2.1 | SRV | — |
| 0 | MWL | — |
| 68.6 | MSA | CAM BLKD BY 20% GREASE |
| 2.1 | SSS | — |
| 2.1 | SAP | — |
| 2.1 | MGO | REINFORCEMENT VISIBLE & MISSING THROUGHOUT |
| 17 | ID | — |
| 68.6 | SRV | — |
| 17 | H | — |
| 68.6 | SAP | — |
| 0 | MWM | — |
| 2.1 | IG | POSSIBLY INFILTRATION @ A JOINT - MINERAL / CRYSTALS BUILD-UP OBSERVED |
| 46.8 | MGO | LARGE HOLE / THIN SEWER CEILING - 11 TO 1 O'CLOCK |
| 21 | H | — |
| 0 | AMH | 03 0609 |
| 68.6 | ID | — |
| 68.6 | DAGS | — |
| 68.6 | SSS | — |