Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2021, 08:43 AM
  • 05 0928_05 0927_01132021_005652.mp4

Date
01/13/2021
W/O
865286
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00547
PipeID
P06160
Time
12:43 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8418
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_865286_TV05372_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0927
Downstream MH
05 0928
Dir. of Survey
Upstream
Length Surveyed
324.6 ft.
Total Length
324.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
450
Pipe schematic from manhole 05 0927 to 05 0928
MH: 05 0927MH: 05 0928upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 09280 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ABANDONED0.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ABANDONED2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish79.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"131.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"183.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"288 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"322.6 ft. MGO - General Observation - 60% MAG COAT322.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start322.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start322.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start324.6 ft. AMH - Downstream Manhole, Survey Begins - 05 0927324.6 ft. MWL - Water Level, 20 %of cross sectional area324.6 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (4)

  • General Observation - 60% MAG COAT

    2 ft. - General Observation - 60% MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
244.9TFC
2MGO60% MAG COAT
90.1TFC
36.6TFC
2DAGS
322.3SSS
324.6AMH05 0928
193.4TFC
322.3SAP
0AMH05 0927
324.5MGOCONN @ MH 3 O'CLOCK/ABANDONED
0MWL
324.6DAGS
2SSS
0MWM
2SAP
324.5MGOCONN @ MH 9 O'CLOCK/ABANDONED
141TFC

Properties (7)

additional_info
630069011221202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-13T00:43:23-08:00
documentation
PRO PIPE
is_lateral_inspection
false