Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2021, 08:27 AM
  • 05 0927_05 0926_01132021_004114.mp4

Date
01/13/2021
W/O
865286
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00547
PipeID
P06159
Time
12:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8418
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_865286_TV05372_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0926
Downstream MH
05 0927
Dir. of Survey
Upstream
Length Surveyed
336.3 ft.
Total Length
336.3 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
317
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
451
Pipe schematic from manhole 05 0926 to 05 0927
MH: 05 0926MH: 05 0927upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 09270.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish12.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"67.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"170.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"272.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"290.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start323 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"330.6 ft. MGO - General Observation - 65% MAG COAT334.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start334.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start336.3 ft. AMH - Downstream Manhole, Survey Begins - 05 0926336.3 ft. MWM - Water Mark, 25 %of cross sectional area336.3 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    5.7 ft. - General Observation - 65% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    45.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
268.4TFC
13.3TFC
335.9SAP
336.3AMH05 0927
45.9SSS
2DAGS
324TFC
2SAP
5.7MGO65% MAG COAT
335.9SSS
0AMH05 0926
166.2TFC
0MWM
217.5TFC
63.5TFC
335.9DAGS
0MWL
113.6TFC

Properties (7)

additional_info
630069011221202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-13T00:27:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false